Construction of 138kV/25kV substation, including concrete, underground infrastructure, welded aluminum bus, 138kV A-frame, 138 kV switches and two main power transformers. Additionally, installed a 25kV distribution A-frame with eight feeder bays, reclosers, and main tie breakers.