New 34.5kV/115kV substation connecting 43 Siemens 2.3 MW wind turbines to Interconnect Utility’s 115kV Judson Large-Cudahay transmission line, including installation of concrete foundations, steel structures, equipment, and a Harmonics Filter system.Also included revisions to the existing Gray Substation.